The problem with concrete houses in Birmingham were that the concrete crumbles away, the steel reinforcement erodes and cracks appear on Birmingham Concrete houses. Concrete houses built in Birmingham prior to 1960 were deteriorating rapidly and were in urgent need of the removal of the concrete on the Birmingham concrete house. The full PRC repair will remove all of the concrete from the Birmingham house. At the time Birmingham City Council had employed structural engineers M Dysons Associates to obtain tenders on behalf of Birmingham City Council in order to have full prc repairs carried out on Wates houses in Birmingham.In Birmingham there several thousand of the 1.5 million prefabricated concrete houses built during the 1940s, 1950s and 1960s. More than 200 Cornish Concrete prc houses were sold to Birmingham City Council tenants under the right to buy scheme in Birmingham, with Birmingham City Council still maintaining hundreds of Airey, Cornish type 11, Boot, Stent, Unity and Wates Concrete houses. |
|||||
You can contact us by any of the methods below:
Company registration number 7801448